Technical Support
You can sign the maintenance contract for all our products, which will allow you to get the most out of them.
Notifications
Clear all
Survey
1
Posts
1
Users
0
Reactions
216
Views
Topic starter
Yes. In configuration, the observation time can be established for points that require greater precision.
To take a point with epochs, it is enough to make a long press on the recording key, both in survey and stakeout.
Posted : 30/06/2022 11:44 am