Technical Support
You can sign the maintenance contract for all our products, which will allow you to get the most out of them.
Notifications
Clear all
Topic starter
Usually it is because the slopes do not cut into the ground. To solve the problem, another slope must be assigned to the slopes or the existing ground must be completed for the cuts to occur.
It is also possible that with the specified dimension it is not possible to find a valid solution.
This topic was modified 2 years ago by Aplitop Team
Posted : 03/06/2021 10:00 am