Technical Support
You can sign the maintenance contract for all our products, which will allow you to get the most out of them.
This option is oriented towards the control of a corridor in the process of execution. With it we intend to carry out the analysis and control of a survey on the MDT, made from standard cross sections with horizontal and vertical alignments, which has produced the theoretical state of the terrain of a linear work.
There are two calculation methods: using a Surface, or using Cross-sections. In both cases we must select the Points file to analyze.
Once the MDT dialog has been validated, it performs a calculation process with the previous data and displays a list on the screen with the following information on each line: stake out point, station, and displacement with respect to the alignment, X, Y coordinates, theoretical elevation, elevation real and difference between the two.